Skip to Content
City of San Francisco Home page
 
Port of San Francisco

 

SWL 337 Project Area Environmental & Engineering Reports & Plans

Preliminary Screening Evaluation, H&H Ship Service Co., September 14, 1995 (PDF)

RCRA Closure Certification Report, Former H&H Ship Service Facility, February 14, 1999 (PDF)

Site Use History and Proposed Article 20 Sampling Program, Proposed Imperial Weitz Parking Lots, March 1999 (PDF)

Soil Analysis Health Risk, June 1999 (PDF)

Appendix E pt. 1-2 (PDF)

Appendix F (PDF)

Soil Management Plan, Imperial Weitz Parking Lots for the Giants Pacific Bell Ball Park, Area E – Port of San Francisco, June 1999 (PDF)

Response to Comments, RCRA Closure Certification Report, Former H&H Ship Service Facility, November 2, 1999 (PDF)

Geotechnical Engineering Assessment, November 1, 1999 (PDF)

Covenant to Restrict Use of Property, Environmental Restriction, H&H Site located at Seawall Lot 337, January 27, 2000 (PDF)

 

SWL 337 Utilities & As-Built Plans

SWL 337 As-Built 1 (PDF)

SWL 337 As-Built 2 (PDF)

SWL 337 As-Built 3 (PDF)

 

Pier 48 As-Built Plans

Pier 48 As-Built 1 (PDF)

Pier 48 As-Built 2 (PDF)

Pier 48 As-Built 3 (PDF)

Pier 48 Utilities 1 (PDF)

Pier 48 Utilities 2 (PDF)

Pier 48 Switchboard elevations (PDF)

Pier 48 Electrical meter room (PDF)

Pier 48 Electrical room enlarged plan (PDF)

Pier 48 Single line diagram for Sheds A-B (PDF)

Pier 48 General plan for Sheds A-B (PDF)

 

Pier 48 Superstructure Rapid Condition Assessment Reports

Pier 48 Shed A – Super Condition Report 2006 (PDF)

Pier 48 Shed B – Super Condition Report 2006 (PDF)